Monday, 23 November 2026

Planner’s Take, 23 November 2026

A State-led O'Connell Street, built on one and two-bed apartments, reopens the question of who the city centre is for

This is an editorial from BPS Planning, issued for discussion only.

There is a particular candour available to a senior public servant handed a new job and a blank page, and Robert Watt used it well at the weekend. Speaking at an EU presidency conference on architecture in Dublin, the man who will lead the new Dublin City Development Company said that O'Connell Street had lost its way, that the State had not been active enough in assembling and managing land, and that allowing a developer-led approach rather than a State-led one was the biggest urban failure we have had. Few planners would quarrel with much of that. It was his next remark, that the homes around O'Connell Street would more than likely be one and two-bedroom apartments for people who might live there for a while and then move out if they have a family, that drew the objections in the room, and it deserves a careful hearing rather than a reflexive one.

The case for his view is not hard to make. The street and its hinterland are full of upper floors that have stood empty for decades and of awkward buildings whose floor plates and stairs lend themselves more readily to smaller units than to family homes. Conversion is slower and dearer than it looks on a drawing, and a regeneration body that wants to show results within a few years will reach for what can be delivered. There is also real demand for small, well-located homes among people who work in the city. A scheme of one and two-bed apartments is not a failure of ambition if it fills buildings that would otherwise rot.

Yet there is a difference between accepting what particular buildings can accommodate and settling in advance on the kind of people a whole district is for. The assumption that families belong elsewhere has shaped Dublin for generations, through a long series of reasonable decisions, each defensible on its own terms, which together thinned out the inner city's children and then wondered why its schools, parks and evening streets felt quiet. A city centre where people are expected to arrive young and leave once they have a pram is, in a quiet way, a transit lounge with very good architecture. The architects who pushed back at the conference were making that point, and Mr Watt was right to concede that there is a debate to be had.

What gives this debate its weight is the other half of his argument. If the State is now to assemble land and prepare master plans for large sites, beginning with the Carlton site above the planned MetroLink station, which has stood vacant for the better part of a quarter of a century, then the State will be making choices that the market used to make for it, and it will be expected to make them better. A development company that controls the land does not have to accept the unit mix that maximises return per square metre. It can plan for a proportion of larger homes on the bigger sites, where new buildings can be designed for families from the outset, while accepting smaller units in conversions where the fabric leaves little choice. It can also plan the things that make family life in a city plausible, from a school within walking distance to streets that feel safe in the evening, a point Mr Watt himself made when he said that many Dubliners are afraid to visit O'Connell Street at certain times of day.

There are counter-arguments, and they should be weighed honestly. Larger apartments cost more to build and sell or let for less per square metre, and a public company spending public money will be held to account for viability as much as for vision. The national planning statement on apartment standards, issued earlier this month, already governs matters such as unit mix and space standards, and a local regeneration body cannot simply wish those parameters away. And it may be that, in the first wave of conversions, smaller homes are simply what the buildings will bear.

None of that, however, requires the strategy to begin by ruling families out. The company will be established next month, and the remaining parts of the Planning and Development Act 2024 come into force this week, bringing with them new tools for urban regeneration. That is a rare moment to set the brief rather than inherit it. A State that has at last decided to lead on land would do well to lead on who the land is for, and to plan a city centre that people can grow old in, not merely pass through.

© Brendan Buck 2026. Cite as: Buck, B. (2026) 'A State-led O'Connell Street, built on one and two-bed apartments, reopens the question of who the city centre is for', BPS Planning, 23 November 2026, https://blog.bpsplanning.ie.

Irish Town Planner Planning News Roundup, 23 November 2026

Here is today's round-up of town planning news from around Ireland, catching up on the weekend, covering the housing mix planned for O'Connell Street, 240 homes upheld in Bandon without a €540,100 road charge, a sharp fall in judicial reviews of An Coimisiún Pleanála decisions, 100 homes permitted in Kenmare and a Westport homeowner's return after pyrite.

O'Connell Street regeneration to be built mainly on one and two-bed apartments

Robert Watt, who will lead the new Dublin City Development Company, told an EU presidency conference on architecture in Dublin at the weekend that one and two-bedroom apartments are likely to dominate the regeneration of O'Connell Street, with a strong focus on converting vacant and underused buildings and redeveloping derelict sites mainly for homes. He said the State had not been active enough in managing and assembling land, describing the reliance on a developer-led approach as the biggest urban failure, and said the company would be established next month and would prepare mixed-use master plans for large sites such as the Carlton site above the planned MetroLink station. Several architects and delegates challenged the view that the city centre is not suited to family living, and Mr Watt said there was a debate to be had on the residential mix.

Source: The Irish Times (23 November 2026)

240 homes in Bandon upheld on appeal, with €540,100 road contribution removed

An Coimisiún Pleanála has upheld Cork County Council's permission for Wayleaf B Limited's Ard Alainn scheme of 156 houses and 84 apartments, with a 60-child crèche, on a 10-hectare site at Convent Hill on the northern edge of Bandon. An adjoining landowner had appealed over the site boundary, but the inspector found that a possible mapping discrepancy meant there may be no encroachment on the appellant's property or laneway. On the developer's own appeal, the inspector found that a special contribution of €540,100 for road widening did not comply with the legislation, and it has been removed from the permission.

Source: Irish Independent (Local Democracy Reporting) (23 November 2026)

Judicial review challenges to An Coimisiún Pleanála fall by 42 per cent

The number of judicial review challenges to An Coimisiún Pleanála decisions has fallen by 42 per cent, from 132 to 76, with 67 per cent of the commission's decisions now reported to withstand challenge. The fall has been linked to a more structured and legally strategic approach to decision-making within the commission, including monthly analysis of cases, a trend its chief executive Peter Mullan had pointed to at an Oireachtas committee in May. Earlier this month, Mr Justice Richard Humphreys told a Law Society conference that the Planning and Environment list had more than 300 live cases but that cases were down on last year up to mid-October.

Source: Newstalk (22 November 2026); Business Post (21 November 2026)

100 homes granted off Pat Scarteen Road in Kenmare

Kerry County Council has granted a 10-year permission, with 22 conditions, to KPH Construction for a large-scale residential development of 100 homes off Pat Scarteen Road in Killowen, Kenmare, made up of 40 two-storey three-bed houses and 60 own-door one and two-bed maisonettes and apartments, with a Natura Impact Statement submitted with the application. When the plans were lodged, Uisce Éireann said a connection could be facilitated subject to capacity upgrades, and that it was negotiating for a temporary production well as an interim supply for the town ahead of a long-term water project. The decision, made on 19 November, can be appealed to An Coimisiún Pleanála.

Source: Kerry County Council planning register, ref. 2660925 (19 November 2026); Radio Kerry (7 October 2026)

Westport homeowner moves into rebuilt home after pyrite demolition

Maria O'Malley has moved into a new home at Páirc na Coille in Westport, an estate built through a Mayo County Council affordable scheme in 2003 where pyrite was found in her house and 31 others, after demolition and rebuilding under the Enhanced Defective Concrete Block Scheme. She described the financial and administrative strain of the process, including bank lending, upfront energy grant funding and a grant calculated on floor area rather than full cost. Mayo County Council said it has received 540 applications under the scheme, with work completed on 184 homes, and that the grant cap has risen from €420,000 to €462,000, while Department of Housing figures from August showed 604 homes nationally had completed remediation out of 3,764 applications.

Source: The Irish Times (23 November 2026)

Sunday, 22 November 2026

Where Climate Promises Go to Live or Die



Another UN climate summit has ended in overtime, with Ireland at the top table. It is tempting to see it as a fortnight of diplomacy far from the county council planning counter. That would be a mistake. The real test of every pledge made in Antalya will be passed or failed in Irish planning decisions.

By Brendan Buck MIPI


A plenary session at COP31 in Antalya. Photo: UN Climate Change, via Flickr.

At dawn this morning, in a conference centre on the Turkish Riviera, delegates from almost 200 countries were dragging themselves back into a plenary hall for what was meant to be the end of COP31. The summit was due to finish on Friday. It ran through Saturday and into the small hours of today, as the Turkish and Australian co-presidents tried to put together a text that nobody would block.

As this article went to press, the deal on the table was a thin one. The draft dropped every explicit reference to fossil fuels. It may also become the first COP text to admit that the world is on course to overshoot the 1.5-degree goal set in Paris a decade ago, though on Sunday morning the text was still a draft. Activists were already calling it the worst COP ever.

It would be easy to read all that and turn the page. Antalya is a long way from a planning office in Portlaoise or Castlebar. And the texts are written in the flat, careful language of diplomats, where "urges" and "encourages" carry weeks of fighting.

But I have spent my working life in Irish town planning, and I have come to a fairly blunt view. Ireland's climate commitments are not really kept or broken in Antalya, in Belém or in Brussels. They are kept or broken in planning decisions. Those include the development plan that decides where homes, jobs and energy infrastructure should go, the judgement that puts the right wind farm on the right site and refuses the wrong one, the grid line that takes years too long to decide, and the housing estate built where the sea will be in 2080. Good climate planning means saying yes in the right places and no in the wrong ones, and doing both for clear, evidenced reasons. If planners are not paying attention to COP, we are missing the part of the story that is about us.

A fortnight of words, and a few that matter

Start with what Antalya produced, because some of it is aimed squarely at the built environment.


A ministerial roundtable at COP31 under the banner "Dialogue, Consensus, Action". Photo: UN Climate Change, via Flickr.

The headline idea, pushed by the Turkish hosts, is a pledge to raise electricity's share of global final energy use to 35 per cent by 2035, up from around a fifth today. Critics are right that the text does not say the electricity has to be clean. But for a country like Ireland, which is already committed to electrifying heat and transport, the direction is clear. More of our energy will come through wires, and every wire has to go somewhere.

Alongside it came the Antalya Compact for Energy Efficient Buildings. It aims to cut the energy intensity of the world's building stock by a quarter by 2035. And there is a new roadmap on adaptation finance, running from Antalya to next year's COP in Addis Ababa, though without a figure attached.

Ireland had an unusual seat for all of this. Because we hold the rotating Presidency of the Council of the EU, Minister for Climate Darragh O'Brien co-led the European Union's negotiations. Ireland also signed up as a "champion country" in a new global peatlands initiative, and the Government chose the summit to publish its national electrification roadmap.

That is a good international profile. The difficulty is what lies behind it at home.

The gap we carry into the room

The EPA's projections from May make grim reading. If every policy and measure in the Climate Action Plan is delivered, Ireland's emissions would fall by about 25 per cent by 2030. The law requires 51 per cent. Under our EU target, which requires a 42 per cent cut in the non-ETS sectors, measures already in place get us to around 13 per cent. Almost every sector is now projected to exceed its emissions ceiling, and the second carbon budget is likely to be missed.

The Minister himself has been candid. Speaking in Antalya last week, he accepted that Ireland will not meet its 2030 targets, while arguing that we are moving more steadily towards them.

There are many reasons for the gap: agriculture, transport, the slow pace of retrofit. But look closely and a good share of it is a planning story. Onshore wind and solar have to be consented. Grid reinforcement has to be consented. Compact, walkable growth that makes public transport viable has to be planned and permitted. When those things stall, the targets stall with them.

Section 15 grows teeth

For years, many in the profession treated the climate duty in planning law as a box to tick. Section 15 of the Climate Action and Low Carbon Development Act requires public bodies, including planning authorities and An Coimisiún Pleanála, to act "in so far as practicable" in a way that is consistent with the Climate Action Plan and national climate objectives. It was easy to treat that as a paragraph in the planner's report.

That changed in February. In Coolglass Wind Farm Ltd v An Coimisiún Pleanála, a seven-judge Supreme Court held that section 15 creates a binding legal obligation, enforceable through the courts. The case concerned a wind farm in Co Laois that had been refused largely because the county development plan ruled out turbines on that site, mainly on visual grounds. The court found that the decision-maker had never engaged in a real and substantive way with the climate benefit of the project. That was an error of law.

The judgment was narrower than the High Court's. It does not say climate trumps everything, and it does not hand the courts a role in individual planning decisions. But it puts every planning authority on notice. Since then, the High Court has applied Coolglass both to renewable projects and to developments that generate emissions. The duty cuts both ways.

There is a structural problem here, too. Most of our county development plans were adopted between 2021 and 2023, before the current generation of climate policy. Climate Action Plans are revised every year, while development plans run for six years, and that is moving to ten under the Planning and Development Act 2024. In practice, local policy will often lag behind national climate policy, and the planner writing the report will have to work out how to reconcile the two.

This is where COP comes back in. Our Climate Action Plan, our carbon budgets and our EU targets all exist because of the architecture built through these summits since Paris. When Antalya talks about electrification or buildings, the language will feed into the next EU framework, and then into the next Climate Action Plan. Through section 15, it lands on the planner's desk.

Electrify everything, but where?

The 35-by-35 pledge sounds abstract until you translate it into planning applications. More electricity means more wind farms, more solar, more battery storage, more substations and more overhead lines. Every one of these needs a site, an environmental assessment and, usually, a fight.

Europe has already changed the rules to speed this up. Under the revised Renewable Energy Directive, known as RED III, member states were required to designate renewables acceleration areas by February of this year. These are places where specific technologies are not expected to have significant environmental effects, and where consents should move faster. Most of the RED III provisions have applied in Irish planning law since August 2025. Mandatory EIAR scoping for these projects has applied since 1 November 2026, and the SEAI now acts as the single point of contact for applicants.

I want to be careful here. Faster does not mean careless. As I have argued before, there are parts of this country, deep peat on steep upland slopes above all, where wind farms should be screened out entirely. Derrybrien still stands as a reminder of what happens when we get it wrong. Good acceleration areas depend on good mapping, honest constraints and the planning judgement to say no where no is the right answer. That judgement is our profession's job, not the diplomats'.

Plan first, not fight by fight

My own firm, BPS, works on both sides of the planning counter. We prepare applications, but we also act for communities who find a badly considered wind farm or solar scheme dropped on their doorstep. That second role has taught me a lot about why renewables have become so contested in Ireland.

Too often, the first a community hears that its hillside, bog or townland is thought suitable for turbines is when a site notice goes up. By then the developer has chosen the site, commissioned the reports and secured the land options. Residents get five weeks to respond to a stack of documents that took years to prepare. They lodge observations, then appeals, and sometimes end up in judicial review. Developers see objectors as obstacles, objectors see developers as invaders, and the planning system is left to settle a national strategic question one site at a time. It is slow, expensive and bitter, and it suits nobody.

There is a better way, and most of the tools already exist. Where renewables go should be decided strategically, and in public, before any individual application is lodged. That means a proper national strategy and spatial plan for onshore renewables and the grid. It should set out how much capacity Ireland needs, broadly where it should go and, just as importantly, where it should not. Those national decisions should then be carried down through the regional spatial and economic strategies into county development plans, where the areas suitable for wind, solar and storage are mapped and designated.

Development plans are where communities have a statutory right to be heard. A draft plan goes on public display, councillors debate it, and anyone can make a submission on the principle of development across a whole county, rather than fighting over the detail of one scheme. If a community believes its area should be excluded, that argument can be made openly, tested against evidence and decided democratically. Once the plan is adopted, applications in designated areas can be judged on their detail, and developers get the certainty they keep asking for. Outside those areas, the presumption should be against.

The renewables acceleration areas required under RED III give Ireland the chance to do exactly this, provided they are designated through the plan-making system with genuine public participation, not mapped quietly in a department and handed down. Coolglass shows the cost of getting it wrong. A county plan that excluded wind largely on visual grounds, out of step with national climate policy, ended up being tested in the courts through a single application. The answer is not to sideline development plans. It is to make them carry the climate decisions properly, so that communities have their say at the right stage, and that say counts.

The buildings we already have

The Antalya buildings compact matters too, because most of the buildings Ireland will have in 2050 are already standing. The cheapest carbon is the carbon we never emit by knocking down and rebuilding.

For planners, that means taking adaptive reuse, over-the-shop living, subdivision and vacant-property conversion seriously. These are not niche projects. They are climate policy delivered one building at a time. It also means applying the compact growth policies in the revised National Planning Framework consistently, not only when it is convenient. A three-bed semi on the edge of a town, with no bus and two cars in the drive, locks in emissions for sixty years, however good its BER.

The sea is not negotiating

The part of COP Ireland tends to ignore is adaptation, and that may be the part that matters most to planners.

In June, the Climate Change Advisory Council published research from the University of Galway. It concluded that Ireland must start preparing now to relocate homes and infrastructure from coasts that cannot be defended. The State's 2023 coastal change management strategy recommended that consideration be given to a managed retreat option where necessary. But the Department of Housing has said no decision has yet been reached on whether managed retreat is viable here. In September, researchers at UCC published Ireland's first national Coastal Exposure Index. Mayo alone has more than 400km of coastline classed as at "very high exposure".

We have 5,800km of coast, and we are still zoning, permitting and extending buildings along it as if the line on the map were fixed. Every grant of permission in an exposed coastal location is a bet on the future. Some of those bets will be lost, and the State, the insurers and the families who live there will bear the cost. This is a debate the planning system has to lead, not wait for.

What planners should take from Antalya

None of this needs a planner to become a climate diplomat. It does need a change in habit:

  • Treat the climate duty as substantive. After Coolglass, a planner's report that simply recites section 15 will not do. It should weigh climate benefit and climate harm as real factors.
  • Watch the pipeline. COP outcomes become EU law, EU law becomes national plans, and national plans become material considerations. The next Climate Action Plan, due next month, will carry some of Antalya into Irish practice.
  • Plan before you permit. Where renewables go should be settled in a national strategy and then in development plans, where communities can comment, not fought out one application at a time. Renewables acceleration areas, coastal exposure and landslide susceptibility belong at the heart of the next round of plans, not in their appendices.
  • Make reuse the default. Existing buildings are the climate frontline, and the planning system can lower the barriers to using them better.
  • Start the retreat conversation. If the national policy on managed retreat is slow to arrive, local planning still has to stop adding to the problem.

The diplomats in Antalya will fly home this week, and the texts will be filed away. Whether any of it means anything in Ireland will depend on thousands of decisions made over the next decade by planners, councillors, inspectors and commissioners. Most of those decisions will never make the news. Together, they will decide whether Ireland's promises were real.

COP matters to Irish planners because, in the end, we are the people who build what was promised, or who fail to.

Brendan Buck MIPI is Managing Director of BPS Planning & Development Consultants, chartered town planners, Dublin.

COP in 60 seconds

  • What it is: The annual "Conference of the Parties" to the UN Framework Convention on Climate Change, where nearly 200 countries negotiate the global response to climate change.
  • COP31: Antalya, Türkiye, 9–20 November 2026, which ran into overtime. Türkiye held the presidency and Australia led the negotiations.
  • Ireland's role: As holder of the EU Council Presidency, Ireland co-led the EU's negotiating team.
  • Headline items: A 35 per cent global electrification goal by 2035; a buildings energy-efficiency compact; an adaptation finance roadmap to COP32 in Addis Ababa. No explicit language on fossil fuels in the final draft.
  • Why planners should care: COP commitments flow into EU law, then into Ireland's Climate Action Plan, and through section 15 of the Climate Act into every planning decision.

Further reading

© Brendan Buck 2026. Cite as: Buck, B. (2026) 'Where Climate Promises Go to Live or Die', BPS Planning, 22 November 2026, https://blog.bpsplanning.ie/2026/11/where-climate-promises-go-to-live-or-die.html

What was refused should stay refused: the case for taking enforcement seriously

This is an editorial from BPS Planning, issued for discussion only.

Every planning system rests on a quiet bargain. Applicants accept that they must ask before they build, neighbours accept that they will have their say and then live with the outcome, and the council undertakes that what was refused stays refused and what was never sought is not quietly tolerated. Plans, standards and appeals all depend on that last undertaking, and it is the one that attracts the least attention, the fewest staff and almost none of the political energy that goes into the arguments about permissions.

Two stories from the past few days show the bargain under strain from opposite ends. In Dublin's north inner city, the North City Centre Residents Alliance has published research describing houses, upper floors and former offices being divided into bedsits, studios and rooms let by the bed without planning permission, and without any assessment of fire safety, space standards or the conservation of the Georgian streets in which many of them sit. It has asked the Office of the Planning Regulator to review how enforcement is carried out across the city council's area, and it notes that the council has four planning enforcement officers for the whole northside of the city. In Sutton, meanwhile, a homeowner whose extension was the subject of an enforcement notice six years ago, and which a judge ruled unauthorised earlier this year, has lodged a fresh application to retain it in amended form.

The cases could hardly be more different in scale or in their human consequences, but they ask the same question. How long does it take, and how much does it cost, for the planning system to mean what it says?

In the inner city the difficulty is partly legal and partly practical. Development begun before the Local Government (Planning and Development) Act 1963 came into force on 1 October 1964 does not need permission, so a claim that a building was already in multiple occupancy before then can be enough to stall a complaint, and the residents point out that the affidavits offered in support of such claims are not published. Exempted development rules introduced in 2018 to bring vacant commercial floorspace back into residential use were a sensible response to vacancy, but the alliance argues that some conversions now produce substandard units that sit outside ordinary scrutiny. None of this is a scandal in the tabloid sense. It is the slower and more corrosive problem of a system that has the powers on paper and too few people to use them.

There is a fair case to be made for the councils. Enforcement is labour-intensive, legally exposed and frequently thankless. Every file can end in court, evidence of when a use began is often thin, and officers must act proportionately, not least where the people living in a poorly subdivided building are themselves the most vulnerable party. A sudden campaign of enforcement that emptied rooms without any thought for where their occupants would go would solve one problem by creating another. Councils have also had to put scarce planning staff into processing applications at a time when every Minister wants housing numbers to rise.

Retention, too, has its defenders. The ability to regularise works carried out without permission exists because not every breach is wilful, and a system that insisted on demolition in every case would be both harsh and wasteful. The difficulty arises when retention becomes the expected end of a long road rather than an occasional remedy, because each new application resets the clock and asks neighbours to object all over again to something they believed had been settled.

The Planning and Development Act 2024 gives an opportunity to look again at all of this, as its provisions are commenced and as councils adjust their procedures. The regulator already has power to review how planning authorities carry out their functions, and a review of enforcement resourcing and practice in Dublin would be a reasonable use of it. Publishing basic information about enforcement files, the time they take and how they end would cost little and would do much to answer the charge of informal tolerance, whether or not that charge is borne out.

My own view is that enforcement deserves to be treated as part of housing policy rather than an afterthought to it. The quality of homes being created by subdivision matters as much as the number of new units granted on greenfield sites, and a planning system that cannot show it acts on clear breaches will find it harder to persuade communities to accept the denser development the country needs. Applicants who follow the rules, and neighbours who take part in good faith, are entitled to know that the bargain holds.

© Brendan Buck 2026. Cite as: Buck, B. (2026) 'What was refused should stay refused: the case for taking enforcement seriously', Buck Planning, 22 November 2026, https://blog.bpsplanning.ie.

Irish Town Planner Planning News Roundup, 22 November 2026

Here is today's round-up of town planning news from around Ireland, catching up on the past few days, covering a residents' call for a review of planning enforcement in Dublin's north inner city, 265 homes proposed in Killarney, a religious order's concerns over housing on the Donnybrook laundry site, a new bid to retain a Sutton extension, 143 homes lodged in Blarney and a Westport shop to become a home after a short-term let was refused.

Residents ask planning regulator to review enforcement in Dublin's north inner city

The North City Centre Residents Alliance has called on the Office of the Planning Regulator to review planning enforcement in the Dublin City Council area, covering timelines, court actions, the handling of pre-1963 and exempted development claims, resourcing and public access to enforcement information. Its report says houses, upper floors and former offices across the north inner city, including the Georgian core, are being divided into bedsits, studios and rooms let by the bed without planning permission or assessment of fire safety, space standards or conservation. The council, which has four planning enforcement officers for the whole northside of the city, said it is considering the report and will respond to the residents' groups.

Source: Dublin Inquirer (20 November 2026)

265 homes proposed at Ballycasheen in Killarney

Hillscape Ltd has lodged a large-scale residential development application with Kerry County Council for 265 homes on an 8.68-hectare greenfield site off Rookery Road, beside St Oliver's Primary School, comprising 143 two-storey houses and 122 maisonettes and apartments, with a 54-place crèche and 413 car parking spaces. The scheme was redesigned after the council said in May that an earlier version, at 37 units per hectare, fell short of the 40 units per hectare minimum for urban neighbourhood sites, and apartment blocks were replaced with two-storey maisonettes. A Natura Impact Statement was submitted because of possible effects on lesser horseshoe bats, for which the Killarney National Park Special Area of Conservation is designated.

Source: Irish Examiner (19 November 2026)

Religious order raises concerns over scale of Donnybrook laundry housing

The Religious Sisters of Charity, which ran the Donnybrook Magdalene laundry in Dublin 4 for more than a century, raised concerns in a planning observation to Dublin City Council about the "excessive scale" of housing proposed on the former laundry site, citing overlooking of the convent's residences from apartment blocks of up to six storeys. The council granted Pembroke Partnership permission for 34 apartments, duplexes and townhouses last month, and a coalition of local residents has appealed to An Coimisiún Pleanála. At the time of publication the order had not made or contributed to a formal appeal.

Source: The Irish Times (20 November 2026)

New bid to retain Sutton extension after demolition order

Philip Farrelly has lodged a fresh application with Fingal County Council to retain, with amendments, the extension at his home on Burrow Road in Sutton, along with permission for a domestic garage, in a planning dispute dating back to an enforcement notice six years ago. Earlier this year a judge ruled the extension unauthorised and its owner was later given eight months to demolish it.

Source: Irish Independent (22 November 2026)

143 homes lodged in Blarney as Ringwood appeal is withdrawn

Brook Advantage has lodged plans for 143 homes and a 64-place crèche on a 4.7-hectare greenfield site on St Ann's Road, Blarney, next to the former Blarney Park Hotel site where councillors have approved 138 council homes, with 29 homes proposed for transfer to the council as social housing. Separately, Clockstrike Ltd has withdrawn its appeal against Cork City Council's September permission for the 323-home second phase of the Ringwood/Stoneview project at Shean, which includes a primary care centre. The applications come as the Government has committed €27 million to fast-track a new train station at Blarney.

Source: Irish Examiner (18 November 2026)

Westport shop to become a home after short-term let was refused

Mayo County Council has granted permission, subject to five conditions, to convert the former Leaping Lizard gift shop on Bridge Street, Westport, into a residential unit with a new shopfront façade. In September the council had refused an application to convert the same premises into a short-term rental property, describing it as an inappropriate form of residential development given the shortage of residential accommodation in the town.

Source: The Mayo News (18 November 2026)

#end

Saturday, 21 November 2026

Material Considerations: Moving Ground, Rising Water - The Case for Revisiting Ireland’s Flood Risk Guidelines

Material Considerations, 21 November 2026

Moving Ground, Rising Water: The Case for Revisiting Ireland’s Flood Risk Guidelines

This is an editorial from BPS Planning, issued for discussion only. Material Considerations is a Saturday series on the research and academic underpinnings of planning. The figures from the 2026 Maynooth-led sea-level study are taken from the peer-reviewed version published in Ocean Science on 29 October 2026, which revised several numbers in the January 2026 preprint. Sources are listed at the end.

Summary. Irish coastal flood risk assessment rests, in the end, on two numbers: an extreme water level and a climate allowance added to it. Both assume that we know how fast the sea is rising relative to the land at a given place, and two recent bodies of work unsettle how comfortably we can make that assumption. A 2026 reconstruction of a century of Irish tide-gauge data finds that relative sea-level rise has accelerated sharply since 2000 and is fastest in the south and west, while glacial isostatic research confirms that the tilt of the island, uplift in the north-east and slight subsidence in the south-west, is real but small. The planning consequence runs against what the physical geography literature might lead one to expect. The isostatic term, which has occupied so much of that literature, is second-order in the allowance, whereas the acceleration of the eustatic signal, the spatial pattern of the gauge evidence and the amount of development we place on exposed ground are first-order. This article sets the new evidence beside current OPW and planning practice and proposes a pathway-based way of using it. It argues, too, that the 2009 Guidelines, now seventeen years old and carried forward unchanged under the Planning and Development Act 2024, are due a considered revision, one that would cover how they treat climate allowances, baseline years and residual risk behind defences.

1. Two kinds of movement, one number

Anyone who has watched the tide climb a harbour wall in Kinsale or Killybegs has seen relative sea level at work, though not the two quite different processes folded inside it. A tide gauge records the height of the sea surface measured against land that is itself moving. The first process, eustatic change, is the change in the volume of the global ocean, driven by melting land ice and thermal expansion, and it reaches every coast, though not uniformly. The second, isostatic change, is vertical land movement, and in Ireland its main driver is glacial isostatic adjustment (GIA), the slow, continuing response of the crust and mantle to the loading and unloading of the last British-Irish Ice Sheet.

Flood risk practice, sensibly enough, compresses both into a single allowance, a sea-level rise figure added to an extreme water level. The simplification has served us well, but it conceals a question that the new research now makes answerable: which of the two terms ought to be driving our attention?

2. A tilted island: what Irish physical geography contributes

At the Last Glacial Maximum the thickest ice lay over Scotland and extended into Northern Ireland, thinning towards the south-west of Ireland. When it withdrew, the land beneath the thick ice rebounded while the peripheral forebulge beyond it collapsed, and the island was left with a gentle tilt: uplift in the north-east and subsidence in the south-west, with localised relative sea-level fall in parts of the north-east (Bradley et al., 2011; Scourse et al., 2021, both as discussed in McLoughlin et al., 2026). Because Ireland’s ice cover was thinner than Britain’s, the signal here is smaller than the one familiar from Scotland and northern England (Shennan et al., 2018), and three points from this work matter for practitioners.

  • The gradient is real. Empirical Holocene sea-level work, for example in north-west Ireland, is used to test and refine the models (Kirby et al., 2023).
  • The models disagree. Global and regional GIA models (the ICE-5G and ICE-6G families, GLAC1D, and regional Bradley-type models calibrated to BRITICE-CHRONO ice reconstructions) differ in their ice histories and in their assumptions about upper-mantle viscosity, and so in the vertical land motion they predict (Bradley et al., 2023).
  • The magnitudes are modest. Over a planning horizon of decades, GIA is measured in fractions of a millimetre per year at most Irish sites.

EPA Climate Ireland adds a caution worth carrying into any site assessment: published projections allow for GIA but not for land subsidence caused by human activity, so that local ground conditions can add a term which no GIA model is able to supply.

3. The 2026 evidence: a century of Irish tide gauges

The most important recent contribution is A century of sea-level change in Ireland (1925–2024) by McLoughlin, Upton, Swan, Nolan, Hickey, Edwards, O’Beirne and McCarthy (Maynooth, Limerick, Marine Institute, UCC and Trinity), first posted as an EGUsphere preprint in January 2026 and published in Ocean Science on 29 October 2026 after open peer review. Its method is as interesting as its result, and owes as much to the patience of the archivist as to the craft of the statistician. Ireland has a modern National Tide Gauge Network of more than 40 gauges, but only a few records exceed 40 years (Malin Head, Dublin Port, Belfast), and those are concentrated in the north and east. The authors therefore recovered and digitised historic paper marigrams, including previously unused records from Cork and Tarbert, added a Galway record reaching back to 1967, corrected for datum offsets and atmospheric effects, tested 16 alternative GIA corrections, and fitted a Bayesian hierarchical model across all sites.

From that painstaking reconstruction four findings emerge.

  • A clear regional gradient. Over 1925–2024, modelled mean rates of relative rise range from about 0.7 mm/yr at Belfast to about 1.1 mm/yr at Dublin Port, 1.3 mm/yr at Malin Head and Cork, and 1.4 mm/yr at Galway and Tarbert. The highest long-term rate in the study is at Tarbert, on the Shannon Estuary.
  • Strong acceleration. The network-mean rate was well below 1 mm/yr for most of the twentieth century (0.59 mm/yr, 1925–2000), rose to about 3.1 mm/yr over 2000–2024, and the modelled rate reached roughly 4.3 mm/yr in 2024, above 4 mm/yr at five of the six sites. The authors caution that the credible intervals widen towards the end of the record (at Cork in 2024, roughly 2.7 to 5.9 mm/yr), so the direction and coherence across sites matter more than the final-year number.
  • GIA is a small correction. Site-specific GIA adjustments run from about −0.07 mm/yr at Belfast (uplift reducing relative rise) to +0.21 mm/yr at Cork and Tarbert (subsidence adding to it) under the selected model. Choice of model still matters, with Bradley-type models giving the strongest contrast between north and south-west and ICE-6G variants the weakest. The preprint also reported that one older model (ICE-5G) implies roughly 1.2 to 1.5 mm/yr of uplift at Malin Head and Belfast, though the published paper set that model aside as outdated.
  • Data quality is a finding in itself. The Dublin Port gauge diverges after 2001, so the authors used it only to 2001 and extended the Dublin series using Arklow and Howth data. Several vertical datums (OD Malin, OD Poolbeg, OD Belfast and local harbour datums) had to be reconciled site by site.

The site-by-site figures are set out below.

Mean modelled rate of relative sea-level rise at six Irish tide-gauge sites
SiteMean rate, 1925–2024 (mm/yr)95% credible intervalModelled rate in 2024 (mm/yr)
Belfast0.730.42–1.053.89
Dublin Port1.120.83–1.414.24
Malin Head1.280.86–1.734.38
Cork1.280.80–1.854.28
Galway1.380.90–1.984.37
Tarbert1.430.92–2.034.41

Source: McLoughlin et al. (2026), Ocean Science, Table 3 and section 5. The Belfast Harbour record ends in 2015, so its later values lean on nearby Bangor data and the model; rates before the start of the shorter records (Cork, Tarbert, Galway) borrow from the regional signal.

Two other 2026 papers point the same way. A national coastal exposure index published in Natural Hazards uses modelled rates in which Cork and Kerry have the highest rates of sea-level rise and Donegal the lowest, and links the northern low to stronger isostatic uplift. A study of extreme sea levels in north-west Ireland in Frontiers in Climate, working from UKCP18 projections, maps inundation in Sligo Bay for an upper-end relative sea-level rise of 0.56 m by 2100 under a high-emissions scenario (RCP 8.5). The median under that scenario is 0.45 m, which the authors note is lower than for the east coast because of GIA, and they find that the projected increase in inundated area, about 54 per cent relative to the historical baseline, is driven chiefly by mean sea-level rise rather than by changes in tide or surge. Even beneath Benbulben, then, where GIA lends a modest helping hand, it is the eustatic term that dominates the hazard.

4. Current practice

The policy framework is older than the evidence now being brought to bear on it. The Planning System and Flood Risk Management: Guidelines for Planning Authorities (DEHLG/OPW, 2009) appeared in November 2009, the same month in which the Lee flooded Cork, and it remains the published guidance on gov.ie and continues in force under section 27 of the Planning and Development Act 2024. It sets out the sequential, risk-based approach, strategic flood risk assessment (SFRA) at plan level, site-specific flood risk assessment (FRA) at application level, and the Justification Test for development proposed in flood zones. Answering a Dáil question on 15 October 2026, the Minister for Housing said that the Department is working with the OPW on further guidance on climate change and flood risk in the planning process, though none has yet been published. SFRA is now applied at national scale as well: the draft first revision of the National Planning Framework was accompanied by an SFRA (RPS, 2024) that reviewed growth targets for the five cities, all of them coastal or estuarine, as one might expect of an island whose towns grew up where rivers meet the sea.

The courts, meanwhile, have begun to sharpen what “have regard” means in this field. In Voyage Property v Limerick City and County Council, decided in December 2025, the High Court upheld a ministerial direction removing residential zoning from land in Flood Zone A. Mr Justice Holland held that a national policy objective requiring accordance with the Guidelines (NPO 57 of the 2018 National Planning Framework) meant that, for development plans at least, the duty to avoid zoning flood-vulnerable development in Zones A and B is “both mandatory and strong”. The revised National Planning Framework of April 2025 keeps that wording, for its National Policy Objective 78 seeks to avoid inappropriate development in areas at risk of flooding that do not pass the Justification Test, “in accordance with” the Guidelines, and to take account of the potential impacts of climate change. Guidelines that carry so much legal weight deserve to be kept current.

The climate allowances themselves come from the OPW. Its Flood Risk Management Climate Change Sectoral Adaptation Plan (2019) set two future scenarios, and its successor, the Flood Risk Management Sectoral Adaptation Plan 2025–2030, approved by Government in November 2025, keeps them unchanged. The Mid-Range Future Scenario (MRFS) uses +20 per cent on rainfall and river flows and +500 mm of mean sea-level rise, while the High-End Future Scenario (HEFS) uses +30 per cent and +1,000 mm. Both plans include a land-movement allowance of 0.5 mm per year that applies only to the southern part of the country (Dublin–Galway and south of this). The 2025 plan concludes that the allowances remain valid, placing the MRFS and HEFS sea-level figures close to the average and the top end of the IPCC’s Sixth Assessment projections, and it notes that the scenarios are not time-bound but can be taken to represent possible futures for 2100.

National mapping has kept pace with these scenarios. The National Coastal Flood Hazard Mapping (NCFHM) 2021 superseded the earlier ICPSS-based national coastal flood maps. It rests on extreme water levels updated through the Irish Coastal Wave and Water Level Modelling Study 2018 and maps the MRFS and HEFS together with two further scenarios of 1.5 m (H+EFS) and 2.0 m (H++EFS) of sea-level rise, all of it accessible through floodinfo.ie.

Practice on flood relief schemes has gone further still. For these schemes the OPW requires a Climate Change Adaptation Plan, which tests the MRFS and HEFS, identifies adaptation pathways, defines monitoring-based trigger points and, in some cases, requires measures in Year 1, such as foundations designed for higher walls and land reserved for future embankments (O’Neill and Quigley, 2023). The fluvial examples in that paper showed standards of protection eroding to roughly one-in-ten to one-in-twenty by about 2075 under the mid-range scenario if nothing further is done.

What is at stake is set out plainly in Ireland’s October 2025 national submission to the UN General Assembly, which records that, superimposed on today’s 100-year flood, mid-range sea-level rise is estimated to quadruple the number of properties affected by coastal flooding, and that these estimates exclude future urban expansion. The 2009 Cork flood caused damage of roughly EUR 100 million (Olbert et al., 2017, as cited in McLoughlin et al., 2026), and about 40 per cent of the population lives within 5 km of the coast. For an island people, exposure on that scale is hardly a marginal concern.

5. Where research meets practice: five observations

What follows is the author’s analysis, using simple arithmetic on the published figures, and it is meant to illustrate rather than to predict.

5.1 The isostatic debate is second-order for the allowance

Take the 74 years that remain until 2100. Over that span a land-movement allowance of 0.5 mm/yr comes to about 37 mm, while the model-based GIA contributions at southern sites (roughly 0.04 to 0.21 mm/yr) amount to about 3 to 16 mm. In the preprint, swapping the selected GIA model for ICE-5G raised the national absolute rate by roughly 0.6 mm/yr, or about 40 mm by 2100. Set against a 500 mm allowance, these are differences of a few per cent. The north is the exception, for there the largest modelled uplift rates (1.2 to 1.5 mm/yr, from the ICE-5G model that the published paper set aside) would imply roughly 90 to 110 mm by 2100. That is a meaningful quantity, yet a plan that discounted northern allowances on the strength of uplift would be leaning on the most model-dependent number in the literature. That is a weak foundation for decisions whose consequences will outlast the models.

5.2 The existing southern allowance looks conservative, but the margin is small

The 0.5 mm/yr land-movement term applies from Dublin southwards and westwards to Galway, whereas current model-based estimates for Dublin Port, Galway and Cork are lower (about 0.04, 0.16 and 0.21 mm/yr respectively). Far from arguing for a reduction, the comparison suggests that the OPW’s figure was a reasonable precaution in the face of GIA model uncertainty, and one whose practical weight amounts to a few centimetres.

5.3 Acceleration is where the allowance is now tested

The table below extrapolates three constant rates from 2026. Real projections curve upwards, so it should be read as a measure of what the scenarios imply rather than as a forecast.

Sea-level rise implied by constant rates from 2026 (author’s arithmetic)
Rate assumed from 2026By 2050By 2075By 2100
3.1 mm/yr (2000–2024 network mean)~75 mm~155 mm~230 mm
4.3 mm/yr (modelled 2024 rate)~100 mm~210 mm~320 mm
6.8 mm/yr (what a straight-line MRFS of 500 mm by 2100 implies)~160 mm~330 mm500 mm

Rates from McLoughlin et al. (2026) and the OPW MRFS; 24, 49 and 74 years from 2026.

On this arithmetic the MRFS assumes an average rate about 60 per cent above the modelled 2024 rate, and above the upper end of its credible interval (5.8 mm/yr). If rates keep climbing, as the global record suggests (Hamlington et al., 2024, find that the global rate has doubled over three decades), the MRFS may come to look less like a cautious assumption and more like a plausible central case. The HEFS would require an average of about 13.5 mm/yr. Neither number is cause for alarm, but both support treating the MRFS as a minimum for long-lived development rather than as a conservative upper bound, and both lend some weight to the baseline year of the allowance, which every FRA should state.

5.4 Gauges and datums are planning infrastructure

The study is as much a story of data rescue as of sea level, and, perhaps not surprisingly, the gaps it exposes have a geography of their own. The south-west and west, where relative rise is highest, have the sparsest long records, and the Shannon Estuary has particularly thin coverage. Even Dublin Port, the best-known Irish record, needed repair, and vertical datums differ by metres between Malin Head, Poolbeg and local harbour datums. For practitioners this means that an FRA should state which gauge, which datum and which GIA assumption underpin its water levels, and should flag where the nearest long record is distant. It means, too, that the extreme water levels used for mapping need checking against their stated reference epoch, since with relative rise now running at three to four millimetres a year, a baseline set some years ago is already lower than today’s mean level. Most studies, the Sligo Bay work among them, add projected mean sea-level rise linearly to extreme water levels, a simplification worth acknowledging in estuaries.

In a series given over to the academic underpinnings of planning, it is worth saying that none of this is merely academic. In June, in Environmental Trust Ireland v An Coimisiún Pleanála, the High Court quashed permission to raise the bauxite residue disposal area at Aughinish, on the Shannon Estuary, and among its reasons was the Commission’s failure to have regard to the development plan’s strategic flood risk assessment. The court was careful to say that it had not found the flood risk unacceptable, which was a matter for the Commission to decide; what it required was that the assessment be done properly.

5.5 Exposure is the variable planners control

The national figures quoted above are conditional on today’s built environment. Hazard comes from the sea, but the number of properties, people and critical services exposed to it is set by zoning and consent decisions, which is to say by the planning system itself. The OPW fluvial work shows that urbanisation can compound climate effects in small catchments, and on the coast the Cork City SFRA flags that defended areas are highly sensitive to climate change, because the likelihood of defence failure, and of the flooding that follows, increases. Yet a defended edge is not a permanent edge. A wall that has held for a generation offers no promise for the next, and zoning decisions are best made in that knowledge.

6. A practical approach: pathways, not point estimates

The approach the OPW already requires for flood relief schemes translates well to land-use planning, and the suggestions below, which are the author’s own, attempt that translation.

  • State scenario, design life and baseline year. Test the MRFS and HEFS explicitly, and match the horizon to the life of the development. Long-lived or critical assets (hospitals, substations, wastewater plants, strategic housing land) merit HEFS testing and, where consequences are severe, a look at the H+EFS extent on floodinfo.ie.
  • Use observed trigger points. Tie plan reviews and adaptation decisions to measured mean sea level at the nearest National Tide Gauge Network station rather than to a calendar date, so that if observed rise tracks the upper curves, the plan has already said in advance what changes.
  • Safeguard land for adaptation. Scheme adaptation plans reserve space for higher defences and future bypass routes, and local area plans and masterplans can do the same for shoreline setbacks and drainage corridors.
  • Document the geophysics briefly and transparently. One paragraph in each coastal FRA should record the gauge, datum, GIA assumption and local ground conditions, since reclaimed or compressible ground adds subsidence that GIA models do not capture.
  • Push for monitoring where evidence is thinnest. Estuarine and south-west sites are where relative rise appears fastest and gauge coverage is weakest, and so where the value of additional observations is greatest.
  • Plan for defended areas failing, not holding. Residual risk behind defences should be a standing consideration in zoning and in the Justification Test, and the assessment cannot simply be left until later. In Heather Hill Management Company v An Bord Pleanála, the High Court set aside a 197-home permission at Bearna, Co Galway, in part because the Board left the site-specific flood risk assessment to a planning condition and did not apply the Justification Test that the development plan required.

7. Caveats

Several caveats deserve to be kept in view.

  • The numbers changed in review. The century-of-sea-level study was revised substantially between the January 2026 preprint and its publication in Ocean Science in October 2026, and this article uses the published figures. Its reported 2024 rates are derivatives of a smoothed model and carry wide uncertainty, and conclusions about sites with short records borrow strength from neighbouring gauges.
  • GIA corrections depend on the model chosen. The study selected one on the basis of minimising inter-site spread, which is a defensible but not unique criterion, as the authors themselves acknowledge.
  • Beyond 2100, uncertainty about the large ice sheets dominates. The OPW’s national coastal flood mapping already includes a scenario of 2 m of mean sea-level rise (H++EFS).
  • The arithmetic in section 5 is the author’s own. It is a simple extrapolation, not a projection from any of the cited studies.

8. Conclusion

Ireland’s physical geography has given its coasts a gentle tilt, the long memory of an ice sheet still written into the rock, but the planning problem is governed by something more recent and more pressing. The sea is rising faster than it did, fastest in the south and west, and the observations that would tell us more are patchy precisely where they matter most. Current OPW allowances and mapping are broadly well-founded and conservative on land movement, yet they were calibrated before the post-2000 acceleration was documented across the island. The most valuable response therefore lies less in a new number than in a way of working, one in which scenarios, observed triggers, safeguarded land and honest statements of uncertainty become part of every coastal plan and FRA.

There are, in fairness, good arguments for caution. The OPW reviewed its allowances in 2025 and found them still valid, and the published Irish rates sit below what the mid-range scenario implies. Voyage and Heather Hill show that the sequential approach and the Justification Test already have teeth, which suggests that some of the difficulty lies in application rather than in the text. Any revision would also bring transition risk for plans and permissions in progress at a time of acute housing need, and owners of serviced, defended brownfield land will reasonably ask how a stricter treatment of residual risk squares with national policy on compact growth.

Even so, that way of working still needs a home. The 2009 Guidelines continue in force under section 27 of the 2024 Act, and while the Minister told the Dáil in October that further guidance on climate change and flood risk is being prepared with the OPW, the OPW’s own 2025 plan has already reaffirmed its allowances. The opportunity now is to fold the newer evidence into the Guidelines themselves rather than into a supplementary note, with stated baseline years, scenario testing matched to design life, monitoring triggers and an explicit treatment of defended areas. The purpose would be less to raise the numbers for their own sake than to have the framework say plainly how they should be used, so that the next generation of plans is drawn for the sea as it is becoming rather than the sea we remember. Uncertainty will remain, as it always has on this exposed western edge of Europe, but it argues for plans that can adapt rather than for plans that wait.

Sources

© Brendan Buck 2026. Cite as: Buck, B. (2026) ‘Moving Ground, Rising Water: The Case for Revisiting Ireland’s Flood Risk Guidelines’, Buck Planning, 21 November 2026, https://blog.bpsplanning.ie/2026/11/moving-ground-rising-water.html

#end

Holy Cross bid is an early test of what the new apartment standards mean for permitted schemes

This is an editorial from BPS Planning, issued for discussion only.

There is a long tradition in Irish development of treating a planning permission less as a destination than as a resting place on the way to something else, and it has taken barely a fortnight for that tradition to find its way to the new national apartment standards. The backers of the scheme on the grounds of the former Holy Cross College in Drumcondra, a joint venture of Kennedy Wilson and the Dutch pension manager APG, received permission from An Coimisiún Pleanála in January for 1,131 homes. They have now lodged plans for 56 more, which would bring the total to 1,187, by reworking the four blocks on Clonliffe Road that make up the first phase.

The arithmetic is worth setting out, because it tells its own story. All 63 three- and four-bed apartments in those blocks would go. One-beds would rise from 115 to 309, two-beds from 175 to 206, and studios would fall from 125 to 19. The number of people the blocks are designed to accommodate would rise by exactly one, to 1,461. The share of dual aspect apartments in the same blocks would fall from 58 per cent to 45 per cent, still well above the new national minimum of 25 per cent. The applicants' planning consultants say the revised mix and the unit sizes comply with the national planning statement on apartment standards issued by the Government earlier this month.

The site carries a history that anyone in practice will recognise. The Irish arm of Hines first sought permission for 1,614 apartments in July 2021, a permission that was quashed by the High Court, with an appeal to the Supreme Court failing in April 2024. A scaled-down scheme was lodged with Dublin City Council in July 2025 and was cleared by the Commission at the start of this year. Five years and one apex court later, the developer is not starting again but adjusting what it already has, which is rational enough when a permission has cost so much.

Why does this matter beyond Drumcondra? Because it is among the first visible cases of a permitted scheme being re-cut to the new standards, and is unlikely to be the last. The statement was made under the Planning and Development Act 2024 and was accompanied by a strategic environmental assessment, precisely so that it would stand on firmer legal ground than the 2025 guidelines it replicates, which remain the subject of a High Court challenge in which questions have been referred to the Court of Justice of the European Union. Planning authorities will now have to assess applications like this one against national policy that expressly allows more studios and one-beds and a lower dual aspect threshold, alongside their own development plans. For applicants, the incentive is plain: more homes from the same permitted envelope, in a rental market where smaller units are in acute demand. For councils, the harder question is how much weight local unit mix policies can carry when national policy points the other way.

There is a fair case for the change. Dublin has a great many single people and couples who cannot find a home of their own, and a scheme that houses the same number of people in more, smaller units is arguably better matched to who is actually looking. The overall development would still contain 89 three-bed and 37 four-bed apartments, and 119 apartments in the first phase are to be provided for social housing. Nor is there anything improper in a developer applying the rules as they now stand.

The counter-argument deserves equal respect. Removing every family-sized apartment from a first phase is a choice about who lives in a new neighbourhood in its early years, and early years tend to set the character of a place for a long time. Residents who worry that cities are being built for a few years of working life rather than for households that grow and stay are raising a question about the kind of city Dublin is becoming, not merely objecting to height or traffic.

On balance, the application should be judged, as all applications must be, on its merits and against the policy in force, and it would be unfair to treat one developer as a proxy for a national debate. But the Department and the Commission would do well to keep count. If permitted schemes across the country are quietly shedding their larger units, that is a cumulative effect worth measuring before it becomes a settled pattern, and the planning system is at its best when it notices such things before, rather than after, the cranes have gone.

© Brendan Buck 2026. Cite as: Buck, B. (2026) 'Holy Cross bid is an early test of what the new apartment standards mean for permitted schemes', Buck Planning, 21 November 2026, https://blog.bpsplanning.ie/2026/11/holy-cross-bid-is-early-test.html.