Planning applications from 26 November 2026: the BPS checklist

Everything a valid planning application needs under the Planning and Development Act 2024 and its new regulations, set out as one printable checklist.

About this checklist

BPS Planning and Development Consultants has worked through the Planning and Development Act 2024, the new 2026 regulations and the new national forms, and brought every application requirement together in one place. It is written for planners, architects, engineers, surveyors, agents and anyone else preparing an application. Print it, work down it, and tick each item before you publish your notices and lodge.

The checklist is based on the regulations and forms published by the Department of Housing, Local Government and Heritage as of 16 November 2026.

What changes on 26 November

The remaining parts of the Planning and Development Act 2024, including Part 4 (planning permission), Part 6 (environmental assessment) and Part 7 (social and affordable housing, formerly Part V), come into operation on Thursday 26 November 2026, together with the new regulations (Department of Housing). Applications lodged before midnight on Wednesday 25 November continue under the 2000 Act. From 26 November every new application is subject to the new legislation, forms, public notices and validation requirements (ePlanning portal).

The detailed rules are in the Planning and Development (Control of Development – Planning Authorities) Regulations 2026. The forms referred to below are the national forms in Schedule 1 of those regulations. Louth County Council has also published an early guide.

In the checklist, "Reg." means those regulations, "s." means a section of the 2024 Act, and "Fees Reg." means the Planning Authority Fees Regulations 2026.

1. Before you start

  • ☐ The applicant is eligible to apply: the owner, a person with a legal or beneficial interest, a body with the relevant statutory power, or a person applying with the written consent of, or on behalf of, one of these (s.85).
  • ☐ There is no undecided appeal to An Coimisiún Pleanála for the same development. If there is, the authority must refuse to consider the application (s.176).
  • ☐ The right type of permission is chosen: permission, retention, outline, permission consequent on outline, or alteration of an existing permission (Form No. 3).
  • ☐ Outline permission is used only for development of not more than four housing units (s.96), and not for retention, works to or within the curtilage of a protected structure, an activity needing an industrial emissions, IPC, waste, waste water discharge or abstraction licence, or development needing EIA or appropriate assessment (Reg. 10).
  • ☐ Retention is not sought where EIA is required, or where appropriate assessment screening cannot rule out significant effects on a European site. Such an application must be declared invalid (s.95(8)).
  • ☐ If some aspects of the development cannot yet be confirmed, a meeting and opinion under ss.93 and 94 have been sought in advance (Reg. 27).

2. Forms and fees

  • ☐ Form No. 3 (application form), every question answered, signed and dated by the applicant or agent (Reg. 11(1)).
  • ☐ Contact details for the applicant and any agent, including email, in the unpublished section of Form No. 3 (items 24 and 25).
  • ☐ Large-scale residential development (LRD): Form No. 4 as well as Form No. 3 (Reg. 11(2)).
  • ☐ Unconfirmed aspects: the s.94 opinion and Form No. 12 enclosed (Reg. 28(1)).
  • ☐ Documentary proof of eligibility to apply (Reg. 11(3)(f)). Where the applicant is not the owner, a letter of consent from the owner (Form No. 3, item 10).
  • ☐ The correct fee (Reg. 11(3)(h)): for example €65 per house and €34 for an extension or other works to an existing house (Fees Reg. 4 and Schedule 1).
  • ☐ Fee adjustments applied: outline pays three quarters; permission consequent on outline and an alteration under s.140 pay one quarter; retention uses the higher retention scale (Fees Regs. 5 to 7).
  • ☐ With a s.94 opinion, double the fee, or three times with an EIAR or NIS (Fees Reg. 13).
  • ☐ Where a fee exemption is claimed (voluntary organisation or approved housing body), proof of eligibility for the exemption (Fees Reg. 3; Form No. 3).

3. Newspaper notice

  • ☐ Published in the two weeks before the application is lodged (Reg. 5(1)).
  • ☐ In a newspaper on the planning authority's approved list (Reg. 6).
  • ☐ Headed with the name of the planning authority (Reg. 6).
  • ☐ States the applicant's name, the location, townland or postal address, and the type of permission, with the outline reference number where relevant (Reg. 6(a) to (c)).
  • ☐ Brief description of the nature and extent of the development (Reg. 6(d)), flagging where relevant: the number of houses; for retention, the proposed use and period; works to a protected structure; an IPC, industrial emissions, waste, waste water discharge or abstraction licence; a strategic development zone; an LRD, with the application website address; renewable energy development.
  • ☐ States that the application may be inspected or purchased at the authority's offices, and that submissions may be made in writing, on payment of the prescribed fee, within five weeks of receipt (Reg. 6(e)).
  • ☐ Where an s.94 opinion accompanies the application, says that certain aspects are unconfirmed (Reg. 28(3)).
  • ☐ The full page, or a copy showing the date and newspaper title, enclosed (Reg. 11(3)(a)).

4. Site notice

  • ☐ In the new Form No. 2 wording, headed with the authority's name and the applicant's own name, not the agent's (Reg. 7(1)(a)).
  • ☐ The boxes ticked where they apply: LRD (with the number of units), EIAR, NIS, nearshore development, renewable energy, protected structure (Form No. 2).
  • ☐ The description matches the newspaper notice and Form No. 3.
  • ☐ Signed by the applicant, or by the agent with the agent's address, and dated with the date of erection (Form No. 2).
  • ☐ Indelible ink on a white background, on rigid, durable material, secured against weather (Reg. 7(1)(b)).
  • ☐ Yellow background instead if this is a second application within six months on substantially the same site (Reg. 7(4)).
  • ☐ Fixed in a conspicuous position on or near every entrance from a public road, or visible from outside the site if it has no road frontage (Reg. 7(1)(c) and (2)).
  • ☐ Erected within the two weeks before lodging (Reg. 5(1)(b)) and kept in place, legible, for five weeks from receipt of the application (Reg. 8).
  • ☐ A copy enclosed with the application (Reg. 11(3)(a)).

5. Maps and drawings

  • ☐ Site location map at not less than 1:1000 in built-up areas or 1:2500 elsewhere, with scale shown (Reg. 11(3)(b)).
  • ☐ On the location map: site boundary in red, adjoining land controlled by the applicant or owner in blue, wayleaves in yellow, and the position of each site notice (Reg. 11(3)(b)).
  • ☐ Site layout plan at not less than 1:500, boundary in red, showing buildings, roads, boundaries, septic tanks, percolation areas, wells, significant trees and other features on or near the site (Reg. 12(1)(a)).
  • ☐ Floor plans, elevations and sections at not less than 1:200, scale shown (Reg. 12(1)(b)); not needed for outline (Form No. 3).
  • ☐ Levels or contours of the land and proposed structures, related to Ordnance Survey datum or a temporary local benchmark (Reg. 12(1)(c)).
  • ☐ Elevations show the main features of contiguous buildings (Reg. 12(1)(d)).
  • ☐ Existing structure and proposed works clearly distinguished (Reg. 12(1)(f)).
  • ☐ Principal dimensions, including overall height, and distances from site boundaries shown in figures (Reg. 12(1)(g)).
  • ☐ All drawings metric; Ordnance Survey sheet number on OS-based maps; north point on all maps and plans other than elevations and sections (Reg. 12(1)(h) and (i)).
  • ☐ Protected structure: drawings show buildings within the curtilage that would be materially affected (Reg. 12(1)(e)).
  • ☐ Outline: only the plans and particulars needed to decide siting, layout and the other matters on which a decision is sought (Reg. 13).

6. Reports and particulars

  • ☐ Wastewater not going to a public sewer: details of the on-site treatment system and evidence that the site is suitable (Reg. 11(3)(c)).
  • ☐ Protected structure, proposed protected structure, or exterior works in an architectural conservation area: photographs, plans and particulars, such as an impact assessment, showing the effect on character (Reg. 12(2)).
  • ☐ Demolition of a structure that is not protected: an impact assessment (Reg. 11(7)). Floor plans of that structure are not required (Reg. 11(6)).
  • ☐ Change of use, or retention of a change of use: a statement of the existing and proposed use, and plans describing the works and identifying the area (Reg. 11(5)).
  • ☐ Renewable energy development: details of the class of development by type and scale (Form No. 3).
  • ☐ Form No. 3 questions answered on monuments, European sites and Natural Heritage Areas, EPA licences, major accident regulations, SDZ or UDZ, demolition, renewable energy, flooding and previous uses (Form No. 3, items 17 and 18).

7. Environmental assessment (EIA and AA)

  • ☐ Where an EIAR is submitted, the EIAR and the confirmation notice from the EIA portal (Reg. 11(3)(g)).
  • ☐ The EIAR and NIS boxes on the site notice ticked where they apply (Form No. 2).
  • ☐ Form No. 3 answered on whether an EIAR is required and on proximity to a European site (Form No. 3, item 17).

8. Part 7 social and affordable housing (formerly Part V)

  • ☐ Where Part 7 applies: details of how the applicant proposes to comply, by transfer or lease of land or houses or a combination (Reg. 11(3)(e)(i)).
  • ☐ Or a certificate of exemption under s.254 (for four or fewer houses, or housing on 0.1 hectares or less), or the acknowledgement letter if the certificate application is undecided (Reg. 11(3)(e)(ii); s.254(3)).
  • ☐ Where Part 7 does not apply under s.245(2) (for example holiday homes, certain approved housing body or cost rental schemes, conversions keeping at least half the external fabric, works to an existing house, student accommodation), a statement of why (Form No. 3).

9. Large-scale residential development

  • ☐ Form No. 4 (Reg. 11(2)).
  • ☐ A website carrying the full application from the day it is lodged until eight weeks after the decision, or after any appeal decision (Reg. 9), with its address in the newspaper notice (Reg. 6(d)(vi)).
  • ☐ Evidence that Uisce Éireann has confirmed feasibility and network capacity (Reg. 11(4)(a)).
  • ☐ A statement of response to the LRD opinion, where the opinion required one (Reg. 11(4)(b)).
  • ☐ A schedule of accommodation: unit numbers and types, floor areas, bedrooms and bed spaces, private amenity and storage space, room dimensions and areas, and dual or single aspect for apartments (Reg. 11(4)(c)).
  • ☐ Any further information the authority specified in its LRD opinion (Reg. 11(4)(d)).
  • ☐ The documents Form No. 4 asks about, including a statement of consistency with the development plan, a design statement, transport assessment, a taking-in-charge plan where relevant, and a drawing schedule (Form No. 4).

10. Lodging

  • ☐ Lodged within two weeks of the notices. An online application counts if received before midnight on the last day, and a deadline falling on a weekend or public holiday moves to the next working day (Reg. 5(2) and (3)).
  • ☐ Online: one copy of each document, searchable and printable legibly (Reg. 50). All later correspondence will be electronic (Reg. 5(2)).
  • ☐ Paper: the number of copies, and any local supplementary forms, confirmed with your planning authority. The authority can ask for paper copies at any stage (Reg. 12(5)).
  • ☐ Every form, notice, report and drawing refers to the Planning and Development Act 2024, not the 2000 Act (the new forms are all made under the 2024 Act).

Common pitfalls

  • Old templates. Title blocks, cover letters and reports that cite the 2000 Act are easily missed.
  • Inconsistent descriptions. An application is invalid if a notice is misleading or inadequate (Reg. 15(3)).
  • Site notices that come down. The application can be declared invalid on inspection, even after it has been acknowledged (Reg. 15(4)).
  • Relying on further information. The authority can ask only once, within eight weeks (12 with an EIAR or NIS), and only on unforeseen technical or environmental matters or new issues raised by the public (Reg. 20). Front-load the detail.
  • Assuming the file is private. The whole application is published online within five working days (Reg. 15(9)).
  • Third parties. A submission now needs Form No. 5, a statutory declaration on Form No. 6 under s.588, and the €20 fee, within five weeks. Late submissions are returned (Reg. 17).

Transitional points

  • Applications lodged before midnight on 25 November are decided under the 2000 Act (s.626). Notices worded under the 2000 Act only work for applications lodged by then.
  • An Coimisiún Pleanála will decide appeals on those applications under the 2000 Act, even if the appeal is lodged after 26 November, and expects the first appeal under the 2024 Act in February 2027 (advice notice, 16 November 2026).
  • Permissions granted under the 2000 Act are deemed to be permissions under the 2024 Act (s.188, as summarised in the same notice).

Note

General guidance only, not legal advice. Check your planning authority's current requirements before lodging.